What's Hot: 702,000: DC Sees Population Rise Again In 2024
166 Apartments, 221 Hotel Rooms: Second-Stage PUD Filed for Capitol Crossing's Next Phase
✉️ Want to forward this article? Click here.
After sharing its plans with the public last month, a Property Group Partners (PGP)-led development team has filed a second-stage planned unit development (PUD) application for the next phase of Capitol Crossing.
The proposal would deliver 166 apartments, 221 hotel rooms and 20,567 square feet of retail to the center block above the Center Leg Freeway, off F Street between 2nd and 3rd Street NW (map). The residential and hotel uses would each be in 12 stories atop a shared two-story retail-and-amenity podium, which qualifies the project as one building under zoning.
story continues below
loading...story continues above
The center block was originally approved for residential and office uses, although up to 267,000 square feet of lodging and/or educational uses were added two years ago. The hotel will have a penthouse bar/restaurant with wrap-around terrace, and the residences will have a rooftop pool deck. The new phase will share the 1,146 vehicular and 440 bicycle spaces that have already been constructed for the entire development below-grade.
Fifty of the apartments would be affordable (for 40 years) to households earning up to 80% of area median income, and almost half of the residential units will have a traditional or juliet balcony. A little over half of the units will be one-bedrooms and the remainder will be studios and two-bedrooms.
The façade of the residential building will include pre-cast concrete with wood and painted aluminum accents, and the façade of the hotel building will bronze with textured glass accents. The podium is also white pre-cast concrete with bronze accents, and the storefronts are in glass and aluminum; a terrace above the podium may be either green roof space or outdoor amenity space. Ennead Architects is the designer.
Construction is expected to start within the three years after the approving zoning order is released, starting with the podium and the residential portion; work would begin on the hotel portion within three years of a Certificate of Occupancy for the podium or the residential. The North block of Capitol Crossing has already delivered and the South block has zoning approvals and is moving toward the building permit stage.
A zoning hearing has not yet been scheduled.
See other articles related to: capitol crossing, ennead architects, planned unit development, property group partners, zoning commission
This article originally published at http://dc.urbanturf.production.logicbrush.com/articles/blog/second-stage-pud-application-filed-for-capitol-crossing-center-block/18180.
Most Popular... This Week • Last 30 Days • Ever
The federal government could be shut down by the end of today, and that shutdown coul... read »
The 16,250 square-foot home along Foxhall Road NW owned by Fox News anchor Bret Baier... read »
Right on the heels of a $29 million home along Foxhall Road going under contract to T... read »
New data shows that DC continues to make up for population losses experienced during ... read »
Built almost a century ago, the five-bedroom estate will hit the market in Chevy Chas... read »
- How a Government Shutdown Could Affect Home Loans
- At $25 Million, This Is The Most Expensive Home Ever Sold In DC
- The Trump Effect Continues: $10 Million Georgetown Condo Goes Under Contract
- 702,000: DC Sees Population Rise Again In 2024
- The Most Expensive Home In Chevy Chase Will Hit The Market For Just South Of $10 Million
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro