Massive McMillan Reservoir Redevelopment Takes Tentative Step Forward
✉️ Want to forward this article? Click here.

Looking east across the McMillan Reservoir at row houses along 1st Street NW.
Photo courtesy IntangibleArts
There is new movement in the stalled plans to redevelop McMillan Reservoir into a massive mixed-use project with office space, apartments and townhomes, a nursing home, and a hotel. The Washington Business Journal reports that the District has allocated $1 million to produce traffic and preservation studies related to the project. The money represents only a small step forward, but any movement at all is news given how much of an impact the redevelopment could have on its surroundings.
McMillan Reservoir sits just behind Howard University at the northern end of Bloomingdale. For decades it was used as the city’s primary water filtration system until a new system rendered it obsolete. It was shut down in 1985 and has remained abandoned and unused since. The area is now a body of water surrounded by grass land and 20 silos where the sand used in the filtration system was stored. (See photos below.)
The whole complex is an enormous 25 acres, enough space to fit over 500 apartments and over 200 townhomes, a nursing home and 100 units of senior housing, a park, 100,000 square feet of retail, a boutique hotel, and an amphitheater. Those were the features of a draft plan put forth by developer EYA, according to the WBJ report.
If it comes to fruition, such development would change the face of the immediate area. In fact, the area is large enough that it could be considered its own new neighborhood.
The vision is not without its detractors, who argue the planned project is too large and dense and that the space would be better used as green space, with certain historical features preserved.
While it will likely be at least a couple years before redevelopment starts (if it ever does), this will be an important site to watch for current and future residents of Bloomingdale, LeDroit Park, and eastern Columbia Heights.
See other articles related to: mcmillan reservoir
This article originally published at http://dc.urbanturf.production.logicbrush.com/articles/blog/massive_mcmillan_reservoir_redevelopment_takes_tentative_step_forward/2231.
Most Popular... This Week • Last 30 Days • Ever

In this article, UrbanTurf will explain what special assessments are, how they work, ... read »

A new development team is looking to take over the project and move it forward.... read »

A shorter version of the development is now on the table.... read »

DC-area homeowners who sold in the first quarter of 2025 saw an average profit of $15... read »

A DC downgrade; the possibility of a downtown DC grocery store; and the end for Tail ... read »
- What Are Special Assessments in Condo Buildings and What Do They Cover?
- 47 Townhomes + 96 Condos: Big Residential Plans Back On The Boards At Walter Reed
- Plans For 32-Unit Condo Project Next To 16th Street Church Filed With DC
- Even As Gains Fall, Most DC Home Sellers Realizing Six-Figure Profits
- Friday's Must Reads
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro