What's Hot: 702,000: DC Sees Population Rise Again In 2024
Updates on Riverfront on the Anacostia, Canal Park
✉️ Want to forward this article? Click here.
A rendering of RiverFront on the Anacostia. Courtesy of MRP Realty.
The team behind RiverFront on the Anacostia, a large mixed-used development on the boards for just south of Nationals Park along the Anacostia River (map), stopped by ANC 6D’s meeting Monday night to update the community on the latest plans.
The development team, represented by John Begert of MRP Realty, hope to start construction on Phase 1 of the Planned Unit Development (PUD), a 9-story, 325-unit residential building, in the next 18 months. The whole project will total 1.1 million square feet of residential, retail and commercial space.
In response to comments on the 2008 plans, which JDLand has outlined here, more retail has been added to all four project phases, the total of which will now be 18,650 square feet.
A rendering of RiverFront on the Anacostia, Phase One.
The waterfront will be lined with restaurants and there will be several public spaces, including RiverFront Plaza, a collection of park-like areas with seating, River Garden, a terraced garden leading to the water, and a sandy beach-like area (with a beach volleyball court). A boardwalk will span the waterfront, and a marina will be accessible from the complex. The developers are planning on creating a “biofilter” — what looks like a reed-y, mini wetland — on certain sections of the waterfront to cleanse rainwater.
The esplanade. Rendering courtesy of MRP Realty.
Marius Radulescu from architecture firm SK&I told the crowd that the architecture of RiverFront on the Anacostia will be lofty and industrial in keeping with the Navy Yard-feel. Balconies and windows dominate the facades (which also has the floating facade element that keeps popping up around DC), and the water-facing side is almost entirely made of windows to maximize the view.
The development team will return to the ANC this summer to seek approval for the plan before a hearing in the fall.
In other news from the meeting, Canal Park is scheduled to deliver in October/November. Some unexpected utilities found under the site — a former canal — necessitated a rewrite of the plan. The park will have a figure-eight shaped ice skating rink, a giant illuminated cube that will be used as an outdoor movie screen, electric car charging stations, a rain garden that will collect water to be used in the fountains, the skating rink and the toilets, and a green roof that visitors can walk up to.
See other articles related to: apartments, canal park, capitol riverfront, dclofts, mrp realty, riverfront on the anacostia
This article originally published at http://dc.urbanturf.production.logicbrush.com/articles/blog/riverfront_on_the_anacostia_moving_forward/5537.
Most Popular... This Week • Last 30 Days • Ever
If the home ultimately sells for around that list price, it would set a record as the... read »
When purchasing a home, it's crucial to conduct a thorough inspection to determine th... read »
The federal government could be shut down by the end of today, and that shutdown coul... read »
The multi-faceted project will include restaurant, bar, fitness and event spaces.... read »
The 16,250 square-foot home along Foxhall Road NW owned by Fox News anchor Bret Baier... read »
DC Real Estate Guides
Short guides to navigating the DC-area real estate market
We've collected all our helpful guides for buying, selling and renting in and around Washington, DC in one place. Start browsing below!
First-Timer Primers
Intro guides for first-time home buyers
Unique Spaces
Awesome and unusual real estate from across the DC Metro